Concept view of an inland lookout towards the dam and ridgeline

Mixed-use waterfront development · Madibeng Local Municipality

Hartbeespoort
Waterfront

One place to find the whole project. What it is, where it stands, what happens next, and every document produced so far.

Client: Muhammad Waja Development Manager: Akoma Stage 2 working draft, partner review Updated 8 September 2026
View 13 · Concept illustration · Explore the gallery ↗
10.889 Gross hectares, three SG diagrams
3 Portions
6 Open verifications
Dam Frontage

Where it stands

Stage 2 work is under way; verification remains open

Akoma runs this mandate in four stages, risk first. Stage 1 closed on 12 December 2025 with Development Manager's Report 01. Stage 2 turns the site into a tested concept and a market view, but it only produces a reliable answer once six third-party facts are confirmed. Those six checks are listed below.

An internal programme, architect brief and directional base feasibility are now prepared for partner review. Assumption-based work can progress while the six checks remain open; it is not an approved scheme or investment case.

Stage 1

Site assessment and key constraints

Rights, title, physical and infrastructure constraints surfaced and reported.

Delivered 12 Dec 2025
Stage 2

Market analysis and concept

Land-use options, market evidence, business models, illustrative masterplan.

Draft for partner review
Stage 3

Financial modelling and investment case

Capital and operating costs, returns, sensitivities, funding strategy.

To follow
Stage 4

Development programme and framework

Phasing, programme, professional team roles and management framework.

To follow

Latest update, 8 September 2026. Project records, accessible Akoma correspondence and partner instructions have been reviewed. No new town-planning or architect appointment was verified. The July procurement dates are historic, not current deadlines. The next step is partner review of the scope, programme and assumptions before external issue.

On tenants, Nando's opened a site proposal in April 2026 and visited the site on 6 May. The latest matching reply found, dated 13 May, does not confirm viability or a lease. Chicken Licken passed on the site in January 2026 while pursuing another location nearby, and the relationship is still open.

Open items

The six things we need confirmed

Each item below is a fact a third party has to confirm in writing. Until then it stays open, and Stage 2 outputs carry an assumption rather than an answer.

01

Zoning validity

The 2001 records require current zoning certificates, scheme extracts and a written planning-route assessment. Age alone establishes neither lapse nor validity; no approval duration is confirmed.

Open · town planner
02

Portion 4 condition

Portion 4 is the largest parcel at 5.31 ha. Its rights are conditional on Portions 1 to 3 being developed first. We need to know whether that condition can be met, waived or amended.

Open · town planner
03

Floodline and dam setback

The waterfront is the value of this site, and the buildable edge is set by the certified 1:100 year floodline, not by the water. No determination exists yet.

Open · land surveyor or hydrologist
04

Bulk services capacity

Water, sewer, stormwater and power capacity for a precinct of this scale is unconfirmed. Upgrade costs, or the case for on-site systems, follow from the answer.

Open · civil engineer
05

Title and road transfer

Current title deeds are needed to confirm servitudes and bonds. Portion 8, the Magalies Boulevard access road, may never have transferred to the local authority as the 2001 services agreement required.

Open · conveyancer
06

Planning policy and environmental route

The intended mix of hotel, offices, residential, mosque and community uses has not been mapped against Madibeng's planning policy or the environmental screening it will trigger.

Open · town planner and environmental consultant

8 September 2026

Project review pack

The programme, common architect brief and first base feasibility are ready for a partner sense check. They are working drafts, not an approved development mix, professional appointment or investment case.

The proposed sequence is evidence and consultant scope, constraint mapping, market and operator testing, comparable architect options, QS costing and a partner decision. A draft eight-week packaging programme and longer development-timing tests are in the pack. Dates depend on authority, appointments and the planning route.

The architect brief is a standalone Google Doc. The programme, evidence, financial review and decisions are organised in the subpages below. All remain working material for partner review. Mo authorised these subpages to be public on 8 September 2026; this does not approve the development or its assumptions.

Overview

The project

Hartbeespoort Waterfront is a mixed-use development on a landholding assembled from three contiguous portions of Erf 1029, Schoemansville Extension 2, in the Madibeng Local Municipality. The dam-side location is central to the concept. Rights over neighbouring dam-edge land, access and buffers remain to be confirmed.

Akoma is appointed as Development Manager to take the project from raw land to a bankable investment case, and to act as the single coordination point for the professional team.

The site adjoins Tielman Street, Liszt Road, the Village Mall next door, and Road P249-1. That combination, an arterial on one side and the dam on the other, is what makes the holding unusual for its area.

The owner's objective is long-term income and a multi-generational asset, not a short-term sale. Everything in the concept is tested against holding the asset and keeping equity in the family.

Land and rights

Historic rights and current verification

The 8 February 2001 letter records Resolution MC 0026 of 24 January 2001. For Portions 6 and 7 it records 40 per cent coverage, 0.8 floor area ratio, two storeys or 8.5 m, 5 m public-road building lines and parking under Table G. Current rights, road-access restrictions and portion-specific controls must be confirmed. The three SG diagrams total 10.889 gross hectares, excluding Portion 8 and neighbouring land; the earlier 11.9 ha figure was not supported by that sum.

Portion 4

5.3106 ha

Rights deferred and conditional on Portions 1 to 3 being developed first. Local planning input in December 2025 identifies those portions as the existing butchery and the Village Mall, which is exactly why the condition needs a formal reading rather than an assumption.

Portion 6

3.4576 ha

Hotel and ancillary uses. Supports the hospitality anchor without a rezoning, subject to the rights being confirmed as valid.

Portion 7

2.1208 ha

Offices and professional rooms. The basis for the workspace component. The December 2025 planner correspondence flags an unresolved substation servitude; its current registration and municipal status still need checking.

Location

Northern edge of the Hartbeespoort Dam, Schoemansville, North West Province. Portion 8 is the Magalies Boulevard public access road, which is due to transfer to the local authority once services are installed.

Water

The dam carries known water quality challenges and recurring health advisories. The concept is therefore built around visual amenity, boardwalks and viewing decks, rather than swimming or watersports.

Hartbeespoort Dam Erf 1029 Portions 4, 6, 7 Village Mall P249-1 Dam frontage

Concept

What we are exploring

The intent is one integrated precinct rather than a set of separate buildings, held for the long term. The components below are the options on the table for Stage 2. Which of them survive depends on the market work and on the six verifications.

Concept view of a shared garden beneath a broad-canopied tree
11 · Tree garden · Concept illustration
Concept view of a planted walk beside a stone-lined watercourse
12 · Watercourse walk · Conditional landscape concept

Waterfront hotel

A boutique hotel or serviced apartments on the dam frontage, with boardwalks, viewing decks and waterside amenity.

Office hub

Modular office units sized for a range of local businesses, on the portion that already carries office rights.

Residential

A neighbourhood that answers local housing demand and shares amenity with the rest of the precinct rather than sitting behind its own wall.

Community anchor

A mosque as the social core, with shared amenity such as gym, salons and childcare within walking distance of homes and offices.

Sport and leisure

Stables, an arena and an events venue draw on the owner's equine business and the local industry. A padel centre of excellence came out of the February 2026 site visit and sits alongside them in the option set.

Retail and services

A drive-through anchor next to the mall, plus options such as a filling station, visitor centre, market and garden centre. Scale still to be confirmed by the market work.

Timeline

How we got here

May 2025

Site visit and proposal

First site visit on 21 May, photographed and filed. Akoma issues a four-stage development management proposal.

June 2025

Appointment signed

Letter of appointment issued on 11 June and signed on 23 June, covering all four stages.

October 2025

Services commence

Development management begins on 1 October. Stage 1 data gathering starts.

November 2025

Kickoff and professional team

Kickoff on 19 November sets the concept ideas. The 27 November check-in turns to appointing the town planner, civil engineer and architect.

December 2025

Stage 1 closed

Development Manager's Report 01 issued on 12 December. It records the site findings and names the six verifications that gate Stage 2.

December 2025

Local planning input

A Schoemansville planner sets out the position on each portion, the rezoning that a wider mix would need, and the outstanding substation servitude on Portion 7.

February 2026

Concept testing on site

Site visit with a padel academy explored as an additional use, followed by a meeting with the architect and the owner.

April to May 2026

Anchor tenant conversation opens

Nando's opens a site proposal for the portion beside the mall, shares its drive-through requirements, and visits the site on 6 May. A town planning quote also lands in May and goes to the owner for a decision.

July 2026

Town planning procurement prepared

A request for proposal for town planning services is drafted, covering the zoning and Portion 4 questions.

Next

Appoint, verify, then conclude Stage 2

Appoint the town planner, run the six verifications in parallel, then complete the market analysis and concept report on confirmed facts.

Team

Who is involved

Akoma is the single coordination point. All instructions to the professional team route through Akoma, so the owner has one conversation rather than six.

MW

Muhammad Waja

Owner and client

Assembled the three portions. Objective is long-term income and a multi-generational asset, holding rather than selling.

AK

Akoma

Development manager

Mo Bedri, Zubair Sader and Oliver Keisner. Appointed June 2025 to deliver a bankable project package.

PT

Platinum Town Planners

Town planning

Engaged during Stage 1 to read the 2001 resolution and test the zoning position with Madibeng.

+4

Still to appoint

Stage 2 professionals

Land surveyor or hydrologist, civil engineer, conveyancer and environmental consultant. Quantity surveying discussed with Artis QS.

Contact

Get in touch

Akoma manages this project. For anything on the record above, or access to a document, speak to the team directly.